
01. Edit your form online
Type text, add images, blackout confidential details, add comments, highlights and more.

The Water Well Plugging and Abandonment Form, known as the DENR-GW-2, is a crucial document used for reporting procedures related to the plugging and abandonment of water wells. This form is primarily utilized by professionals working within the fields of water resource management and environmental protection to ensure that the abandonment process adheres to regulatory standards. The form captures comprehensive details about the well, including its owner, location, and the specific techniques used during plugging. This ensures that the well is properly closed off, preventing potential contamination of groundwater resources.
Filling out the DENR-GW-2 form involves a series of steps designed to capture all essential information accurately. Here’s a step-by-step guide:
Gather Preliminary Details: Collect all necessary information, including the well owner’s details, exact location coordinates, and well dimensions.
Record Plugging Procedures: Provide a detailed account of the methods and materials used in the plugging process. Specify whether cement, bentonite, or another sealing material was employed.
Include Contractor Information: If a licensed water well contractor performed the work, their details and certification must be highlighted.
Submit the Form: Once completed, submit the form as instructed, either electronically or through traditional mail. It’s crucial that all data is thorough and accurate to avoid submission rejection.
Completing the DENR-GW-2 form accurately ensures compliance and aids in environmental stewardship. Follow these steps for completion:
Download or Obtain the Form: Access the form online or request a physical copy from the Louisiana Department of Energy & Natural Resources.
Fill in Owner Information: Enter the full name, contact information, and address of the well owner.
Provide Well Location Details: Use detailed coordinates or physical descriptions to mark the well’s location accurately.
Detail Plugging Methodology: Include specifics such as the types of materials and techniques used during the plugging process.
Certification by Contractor: Affix the signature and certification number of the licensed water well contractor responsible for supervising the work.
Review and Submit: Double-check for any errors or omissions before submission. This could prevent delays due to incomplete information.
The DENR-GW-2 form ensures legal compliance with state regulations governing water resource management. This helps mitigate legal liabilities associated with improper well abandonment.
Ensuring Environmental Safety: Promotes the safe closing of wells, reducing risks of water table contamination.
Regulatory Adherence: Ensures that all activities meet state-mandated requirements, preventing potential legal issues or fines.
Louisiana has specific stipulations for the use of the DENR-GW-2 form. These include:
At DocHub, your data security is our priority. We follow HIPAA, SOC2, GDPR, and other standards, so you can work on your documents with confidence.
by R Palanca-Tan 2011 Cited by 1 We recommend that NWRB, which has the legal mandate to impose raw water fee sby virtue of PD 424 and 1067, delegate this function to the CDO city government,
Installation of wells by Direct Push technology is not new, and variances permitting the use of. Direct Push wells for long-term monitoring are commonly granted
WATER WELL PLUGGING AND ABANDONMENT FORM (DENR-GW-2). DENR-GW-2 (Rev. 01/24). 1. WELL OWNER: (Denote in remarks if different than original owner). 2. LOCATION