Holyoke building department 2025

Get Form
holyoke building department Preview on Page 1

Here's how it works

01. Edit your holyoke building department online
Type text, add images, blackout confidential details, add comments, highlights and more.
02. Sign it in a few clicks
Draw your signature, type it, upload its image, or use your mobile device as a signature pad.
03. Share your form with others
Send city of holyoke building department via email, link, or fax. You can also download it, export it or print it out.

How to use or fill out holyoke building department with our platform

Form edit decoration
9.5
Ease of Setup
DocHub User Ratings on G2
9.0
Ease of Use
DocHub User Ratings on G2
  1. Click ‘Get Form’ to open the holyoke building department application in the editor.
  2. Begin with SECTION 1: LOCATION. Enter the Block # and Lot # if a street address is unavailable, followed by the street name, city/town, and zip code.
  3. In SECTION 2: PROPOSED WORK, indicate the edition of the MA State Code used and check applicable boxes for new construction or other types of work. Provide a brief description of the proposed work.
  4. If applicable, complete SECTION 3 regarding existing buildings undergoing renovation. Specify existing and proposed use groups.
  5. Continue through each section, ensuring all fields are filled accurately. Pay special attention to construction type in SECTION 6 and site information in SECTION 7.
  6. Finally, review your entries for accuracy before signing in SECTION 13. Ensure all required documents are attached as per Appendix 2.

Start using our platform today to streamline your building permit application process!

See more holyoke building department versions

We've got more versions of the holyoke building department form. Select the right holyoke building department version from the list and start editing it straight away!
Versions Form popularity Fillable & printable
2013 4.8 Satisfied (141 Votes)
be ready to get more

Complete this form in 5 minutes or less

Get form

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
R113. 4 of the 7th Edition of the Massachusetts State Building Code, 780 CMR, violation of any provision of 780 CMR shall be punishable by a fine of not more than $1,000 or by imprisonment for not more than one year, or both for each violation.
Holyoke is a city in Hampden County, Massachusetts, United States, that lies between the western bank of the Connecticut River and the Mount Tom Range. As of the 2020 census, the city had a population of 38,247.
Beyond new construction or interior alterations or additions, a building permit is required for such projects including but not limited to roofing, siding, new or replacement windows and doors, decks, porches, pools, dormers, sheds, garages, walls, and changes in grade.
Can a homeowner pull his own permit and hire an unlicensed and unregistered contractor? Yes. But in that case the permit holder is responsible for compliance with the codes and does not have access to the guarantee fund.
The Building Department has a maximum of 30 days in which to issue or deny a building permit. The actual time can vary from 3 days up to the maximum 30-day limit, depending on the number of applications ahead of yours, and the scope of work.
be ready to get more

Complete this form in 5 minutes or less

Get form