How to use or fill out the COJ Building Permit Application Form
- Click ‘Get Form’ to open it in the editor.
- Begin by entering the Permit Number and Companion Building Permit Number at the top of the form. Ensure these are accurate for proper tracking.
- Fill in your Real Estate Number, Street Number, and Street Name. Include any Unit/Suite details if applicable.
- Provide your Property Ownership Details. Specify whether you are an Individual or a Business and include all relevant contact information.
- In the Project Identification section, enter your project contact phone number and email address. This ensures that you can be reached for any follow-up questions.
- Complete the Site Permit Address section with the physical address where work will occur, including ZIP code and intersecting streets.
- Review all sections carefully before submitting to ensure compliance with local regulations and requirements.
Start using our platform today to fill out your COJ Building Permit Application Form easily and for free!
Fill out coj building permit application form online
It's free
It's free
See more coj building permit application form versions
We've got more versions of the coj building permit application form form. Select the right coj building permit application form version from the list and start editing it straight away!
| Versions | Form popularity | Fillable & printable |
|---|---|---|
| 2025 | 4.8 Satisfied (23 Votes) | |
| 2025 | 4.4 Satisfied (36 Votes) | |
| 2024 | 4.9 Satisfied (36 Votes) | |
| 2023 | 4.3 Satisfied (23 Votes) | |
| 2023 | 4.6 Satisfied (35 Votes) | |
| 2022 | 4.8 Satisfied (77 Votes) | |
| 2022 | 4.8 Satisfied (26 Votes) | |
| 2021 | 4.3 Satisfied (58 Votes) | |
| 2021 | 4.8 Satisfied (195 Votes) | |
| 2021 | 4.8 Satisfied (117 Votes) | |
| 2020 | 4.8 Satisfied (110 Votes) | |
| 2020 | 4.7 Satisfied (60 Votes) | |
| 2020 | 4.3 Satisfied (61 Votes) | |
| 2020 | 4.8 Satisfied (100 Votes) | |
| 2019 | 4.8 Satisfied (66 Votes) |
Got questions?
We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
What requires a permit in Duval County, Jacksonville, FL?
A building permit is required for any construction that physically changes or adds structures to your property or for work regulated by local codes or ordinances such as: New buildings. Additions room additions, patio covers, swimming pools, etc. Alterations re-roofs, garage conversions, exterior stucco, etc.
How long does it take to get a building permit approved in Florida?
General Assistance with Building, Electrical, Mechanical, or Plumbing permits or inspections please call 904-255-8500 or email us at BIDDocuments@coj.net.
What requires a permit in Duval County?
For residential detached structures more than 200 square feet in size (including all floors if a two story building) and for commercial structures more than 120 square feet in size (including all floors if a two story building), a building permit is required.
What can a homeowner do without a permit in Florida?
Do I need a permit? Less than 10 square metres (108 square feet) Not attached to a house or any other building. Not connected to electricity, plumbing, or gas lines. Meets the following height and location criteria: Roof midpoint is no higher than 4.3 metres (14.1 feet)
Security and compliance
At DocHub, your data security is our priority. We follow HIPAA, SOC2, GDPR, and other standards, so you can work on your documents with confidence.
Learn more