ccc ps3
Procurement and Contracting Requirements 00 10 00
This form is to be completed and submitted to the Elevator Section Scheduling Coordinator at the time the request for an inspection is submitted. The
Learn more
Design Manual, Part 4 (Pub. 15M) - December 2019 Edition
Dec 30, 2019 The attached December 2019 Edition of the Design Manual, Part 4 (DM-4) represents a revised publication incorporating the Eighth Edition
Learn more
total sheets
Epoxy Waterproofing entire length or bridge seat as per Supplementary. Specifications. Elevation shown applies to this point of groove. Grooves 4:0ʻoc. (See
Learn more