Related links
Demolition Requirements
A demolition permit is required only if the entire building is to be removed. When multiple buildings on the same lot are to be removed, a separate demolition
Learn more
EPA Method 8330B (SW-846)
by AACAS Numbera 2006 Cited by 20 to permit its use without lessening the accuracy PETN is the major component of detonation cord and blasting caps, often used during demolition activities.
Learn more
Application Requirements for Demolition Permits
You will need a demolition permit to remove any building/structures, including accessory structures with a roof area of more than 200 square feet.
Learn more