Army bill of materials form 2025

Get Form
da form 2702 Preview on Page 1

Here's how it works

01. Edit your da form 2702 online
Type text, add images, blackout confidential details, add comments, highlights and more.
02. Sign it in a few clicks
Draw your signature, type it, upload its image, or use your mobile device as a signature pad.
03. Share your form with others
Send army bill of materials form via email, link, or fax. You can also download it, export it or print it out.

How to use or fill out army bill of materials form with our platform

Form edit decoration
9.5
Ease of Setup
DocHub User Ratings on G2
9.0
Ease of Use
DocHub User Ratings on G2
  1. Click ‘Get Form’ to open the army bill of materials form in the editor.
  2. Begin by entering the ACCOUNT CODE NO. at the top of the form, which is essential for tracking and reference.
  3. Fill in the DATE field to indicate when the form is being completed.
  4. In the PREPARED BY section, provide your name or the name of the individual responsible for preparing this document.
  5. Specify the DESIRED DELIVERY DATE to ensure timely processing and delivery of materials.
  6. Enter the JOB ORDER NO. and WORK REQUEST NO. for internal tracking purposes.
  7. Indicate where to DELIVER MATERIAL TO by filling in that section accurately.
  8. List each STOCK OR PART NO., followed by a DESCRIPTION OF ARTICLE, ensuring clarity on what is being ordered.
  9. For each item, specify UNIT, QUANTITY, UNIT PRICE, and TOTAL COST to provide a complete overview of expenses.

Start using our platform today to streamline your document editing and completion process for free!

be ready to get more

Complete this form in 5 minutes or less

Get form

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
All BOMs should include: BOM level. This is the framework for a multi-level BOM. Part numbers. Each part in a manufactured finished product should have a part number. Part name. Part description. Procurement type. Quantity. Unit of measurement. Reference design.
A bill of materials (BOM) lists all components needed to build a product. It helps organizations manage materials, control inventory, estimate costs, and keep production consistent. A well-maintained BOM also supports quality control, change management, and regulatory compliance by keeping departments on the same page.
The standard Bill of Materials (BOM) format includes item numbers, descriptions, quantities, units of measure, costs per unit, total costs, vendor information (optional), and notes. This structured format helps in listing components required for manufacturing or assembly processes efficiently and accurately.
A template bill of materials (BOM) provides you with a standardized list of components for service objects that are serviced regularly. The components that are listed in the template BOM represent the individual subcomponents of the service object.
Bill of Materials (BOM) A BOM represents a parent/child relationship between a weapon system or end item, its assemblies, its subassembly components, together with the item number, quantity and unit of measure.
be ready to get more

Complete this form in 5 minutes or less

Get form

People also ask

A BOM should list the product name, required raw materials with quantities and units, sub-assemblies, part numbers and descriptions, unit costs, and product quantity.

bom army