Public Agency, Public and Private Utility Right of Way Exemption 2025

Get Form
Public Agency, Public and Private Utility Right of Way Exemption Preview on Page 1

Here's how it works

01. Edit your form online
Type text, add images, blackout confidential details, add comments, highlights and more.
02. Sign it in a few clicks
Draw your signature, type it, upload its image, or use your mobile device as a signature pad.
03. Share your form with others
Send it via email, link, or fax. You can also download it, export it or print it out.

How to use or fill out Public Agency, Public and Private Utility Right of Way Exemption

Form edit decoration
9.5
Ease of Setup
DocHub User Ratings on G2
9.0
Ease of Use
DocHub User Ratings on G2
  1. Click ‘Get Form’ to open it in the editor.
  2. Begin by filling out the 'Timber Owner(s) of Record' section. Enter your name, address, city, state, zip code, and phone number.
  3. Proceed to the 'Timber Tax Exemption' section. Circle the option that best estimates the total volume for this harvest in thousands of board feet (mbf).
  4. Estimate the percentage of timber types to be removed during this harvest. Fill in the percentages for Redwood, Douglas-fir, Fir, Port-Orford Cedar, Cedar (IC, WRC), Ponderosa pine/Sugar pine, Other conifer, and Other hardwood.
  5. Complete the 'Licensed Timber Operator(s)' section with their name, phone number, and license number.
  6. In the 'Public Agency, Public or Private Utility Removing Trees' section, provide the necessary contact details including name and address.
  7. Designate the legal land description of the timberland conversion in Section 5. Attach a map showing its location as required.
  8. Finally, ensure all sections are completed accurately before signing at the bottom of Page Two.

Start using our platform today to streamline your form completion process for free!

be ready to get more

Complete this form in 5 minutes or less

Get form

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
The public right of way includes streets, sidewalks, alleys and other rights of way dedicated to public use. Right of way (ROW) permits are required when there is an obstruction or any work is being done in the public right of way.
Whenever the relocation of any utility facility is necessitated by the construction of a project on a trunk highway route, the relocation work may be made a part of the state highway construction contract or let as a separate contract as provided by law if the owner or operator of the facility requests the commissioner
A Minnesota right-of-way easement gives the owner of the easement the right to pass over, or go across, the land of another person. Federal and Minnesota highways, and railroad routes, are examples of Minnesota right-of-way easements.
Owners are generally prohibited from building over or too close to an easement or must obtain approval from the authority who owns the easement to do so. If a structure is built over an easement without permission or where permission is denied, then the owner will be legally required to remove the structure.
If traffic signs or lights are present at the intersection of two or more roads, then those signs or lights control the flow of traffic. Otherwise, the driver who enters the intersection first has the right of way, and all others must yield to that driver.
be ready to get more

Complete this form in 5 minutes or less

Get form

People also ask

Who Has the Right of Way At Intersections? If traffic signs or lights are present at the intersection of two or more roads, then those signs or lights control the flow of traffic. Otherwise, the driver who enters the intersection first has the right of way, and all others must yield to that driver.
In simpler terms, a right of way is generally focused on movement across the property, whereas an easement might allow a third party to use part of the land in ways that dont involve ongoing transit.
Easements Written An easement must be in writing in order to satisfy the requirements of the Statute of Frauds a legal concept which may be satisfied when: the intention of identified parties is properly expressed in the easement document, and. the property subject to the easement is properly described.

Related links