Ps1 auckland council 2026

Get Form
producer statement Preview on Page 1

Here's how it works

01. Edit your producer statement online
Type text, add images, blackout confidential details, add comments, highlights and more.
02. Sign it in a few clicks
Draw your signature, type it, upload its image, or use your mobile device as a signature pad.
03. Share your form with others
Send producer statements via email, link, or fax. You can also download it, export it or print it out.

Definition and Purpose of the PS1 Auckland Council Form

The Producer Statement Design, commonly referred to as the PS1 form, is a crucial document in the construction industry, mainly in Auckland, New Zealand. Authored by a design professional, this form assures compliance with the New Zealand Building Code when construction is executed precisely as per the provided documents. It is implemented to validate aspects such as structural integrity, safety, and compliance of the proposed design.

The form includes sections for detailing author information, building consent data, and the legal description of the site. The PS1 affirms that should the construction follow the designs, all necessary regulations will be met, ensuring legitimacy and readiness for further project approvals.

How to Use the PS1 Auckland Council Form

Employing the PS1 Auckland Council form involves a systematic approach to ensure the design of building work complies with relevant codes and standards. Professionals engaged in design services need to:

  1. Accurately fill out the details pertaining to the designer and owner.
  2. Outline the scope of work and relate it to specific New Zealand Building Code clauses.
  3. Provide necessary documentation to support design claims.
  4. Perform regular site verification to adhere to standards.

Consistency and thoroughness in completing each section are critical. Collaborating with other professionals in the architectural and engineering fields may be required to ensure multi-faceted compliance.

Obtaining the PS1 Auckland Council Form

The PS1 form can be obtained directly from the Auckland Council’s resource center or their official website. Licensed design professionals should access authenticated forms to prevent issues of non-compliance or invalidation. It's recommended to stay updated with versions and amendments provided by the Council to ensure the used form is current.

Design professionals or builders can also consult with local compliance officers or building certifiers for guidance in obtaining and correctly using the PS1 form.

Key Elements of the PS1 Auckland Council Form

Several elements within the PS1 form demand careful attention:

  • Author Details: Must include full name, contact information, and license number.
  • Building Consent Information: Specify prior underwritten consent to established design parameters.
  • Compliance Statement: Affirm design compliance with code clauses including structural and safety standards.
  • Site Verification Notes: Include any conditions and inspections required during construction.

Every section has a purpose in demonstrating adherence to legislative requirements, reinforcing the validity of the building design documentation.

Steps to Complete the PS1 Auckland Council Form

Filling out the PS1 requires a structured approach:

  1. Start with Author Information: Fill in licensed professional details.
  2. Include Consent Details: Record the building consent number and scope.
  3. Specify Compliance Codes: Reference each applicable New Zealand Building Code section.
  4. Submit Design Documents: Attach supportive documents like site plans and calculations.
  5. Provide Verification Plan: Outline inspection and verification methods to follow.
  6. Review and Sign: Ensure all sections are complete before the professional signature.

Each step should be conducted with precision to facilitate a smooth approval process from the Auckland Council.

Who Typically Uses the PS1 Auckland Council Form

Typically, the PS1 is used by a variety of stakeholders in the construction industry:

  • Design Professionals: Architects, engineers, and designers draft and sign the form asserting design compliance.
  • Builders: Use the PS1 as reference during implementation.
  • City Inspectors: Leverage the form for verifying compliance with construction codes.
  • Property Developers: Rely on PS1 for an assured stamp of compliance in project portfolios.

These users converge to ensure a building project meets both safety and regulatory expectations from start to finish.

decoration image ratings of Dochub

Important Terms Related to the PS1 Auckland Council

Understanding the PS1 involves familiarizing oneself with several key terms:

  • Building Code: A set of structural, safety, health, and accessibility standards.
  • Producer Statement: A document supporting compliance for prefab elements.
  • Indemnity Insurance: Protects professionals against claims in design shortcomings.
  • Site Verification: Evaluation often conducted on-site to align construction accuracy and safety standards.

A strong grasp of these terms aids professionals in effectively utilizing the form for both planning and implementation stages.

Legal Compliance with the PS1 Auckland Council

The PS1 form, fundamentally a legal document, requires adherence to several legal considerations:

  • Professional Indemnity: Design professionals must possess necessary insurance to cover potential liabilities.
  • Submission Deadlines: Timely submission aligns with project timelines and regulatory expectations.
  • Auckland Council's Discretion: The final acceptance of a PS1 form falls under Council prerogative, emphasizing thorough and precise submission.

Failing to comply with these legalities can result in project delays, fines, or rework, stressing the importance of meticulous preparation and adherence.

be ready to get more

Complete this form in 5 minutes or less

Get form

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
Construction category producer statements (PS3) The contractor who has carried out the building work issues a PS3 to confirm that the building work is in accordance with the consent plans and building code.
Producer statement construction review. (PS4) TO BE COMPLETED BY THE DESIGN PROFESSIONAL WHO HAS BEEN ENGAGED TO OBSERVE CONSTRUCTION.
Auckland Council salaries can vary greatly by role, ranging from $64,000 per year (or $31 per hour) for Compliance Officer to $79,000 per year (or $38 per hour) for Advisor. This is based on 931 salaries submitted on Glassdoor by Auckland Council employees as of September 2025.
Only a qualified and approved installer of the specific waterproofing system can issue a PS3. This means: The person must be trained or certified by the membrane manufacturer. The system used must be accepted by the local council, such as Ardex or Mapei.
Below is a breakdown of what each statement entails: PS1 (Producer Statement Design) Specific Purpose: PS1 is issued by a designer or engineer to docHub that the design of a building or structure meets all relevant building codes and standards.

Security and compliance

At DocHub, your data security is our priority. We follow HIPAA, SOC2, GDPR, and other standards, so you can work on your documents with confidence.

Learn more
ccpa2
pci-dss
gdpr-compliance
hipaa
soc-compliance
be ready to get more

Complete this form in 5 minutes or less

Get form