How long does it take to get a permit in Volusia County?
Depending on workload, and all required documents are provided, a Building Permit can be obtained within 10 workdays. Minor projects are normally approved, or additional information requested, within 5 workdays.
How do I schedule a Volusia County permit inspection?
To Schedule an Inspection: Scheduling inspections is easy when you use our online portal, Connect Live. You simply login, click on the inspections link, select the inspection you want to schedule, pick a date and click schedule. Please note: The deadline to schedule a next day inspection is at 3pm.
What work requires a permit in Florida?
The Florida Building Code requires a Building Permit to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to , , enlarge, alter, repair, remove, convert or replace any impact resistant coverings, electrical, gas, mechanical or plumbing system, the
What permits does Volusia County require?
Construction Permits required: Residential construction such as adding a storage area, reconfiguring floor area, adding dining area, adding a porch, adding a deck, adding a shed, installing a new roof, adding receptacles or lighting, upgrading an electrical service, changing out or reconfiguring air conditioning/
What do I need a permit for in Volusia County?
Per Florida Building Code (102.2), a permit shall apply to the construction, , alteration, modification, repair, equipment, use and occupancy, location, maintenance, removal and demolition of every public and private building, structure or facility or floating residential structure, or any appurtenances