Change order template 2025

Get Form
free change order template Preview on Page 1

Here's how it works

01. Edit your free change order template online
Type text, add images, blackout confidential details, add comments, highlights and more.
02. Sign it in a few clicks
Draw your signature, type it, upload its image, or use your mobile device as a signature pad.
03. Share your form with others
Send construction change order form via email, link, or fax. You can also download it, export it or print it out.

How to quickly redact Change order template online

Form edit decoration
9.5
Ease of Setup
DocHub User Ratings on G2
9.0
Ease of Use
DocHub User Ratings on G2

Dochub is a perfect editor for modifying your documents online. Follow this simple guide to edit Change order template in PDF format online at no cost:

  1. Sign up and sign in. Register for a free account, set a strong password, and go through email verification to start working on your forms.
  2. Upload a document. Click on New Document and choose the file importing option: upload Change order template from your device, the cloud, or a secure URL.
  3. Make changes to the sample. Utilize the upper and left panel tools to edit Change order template. Add and customize text, pictures, and fillable fields, whiteout unnecessary details, highlight the significant ones, and comment on your updates.
  4. Get your paperwork completed. Send the form to other people via email, generate a link for quicker file sharing, export the sample to the cloud, or save it on your device in the current version or with Audit Trail added.

Explore all the benefits of our editor today!

See more change order template versions

We've got more versions of the change order template form. Select the right change order template version from the list and start editing it straight away!
Versions Form popularity Fillable & printable
1996 4.8 Satisfied (159 Votes)
be ready to get more

Complete this form in 5 minutes or less

Get form

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
Change order percentages between 8.0 percent and 15.0 percent are usually considered acceptable and reasonable. Profit The contractors profit, as a percentage of the sum of the total direct and indirect costs, should be within a reasonable range.
Ask your CPA for help identifying other types of indirect costs. Many contracts provide for a markup percentage for change orders, such as 10% or 15%, intended to cover overhead, indirect costs and profit.
A fixed sum or lump sum change order is used when changes to the project scope can be accurately quantified, thereby resulting in an overall cost increase for the project. Time and materials (TM) change orders are generally needed when the full scope of the proposed changes are unknown.
Classic examples of change orders include the owners desire to move the location of a wall to accommodate some other design element, adding a window where there was none in the original plans, or changing the finish of the floors from tile to terrazzo.
reasonable changes means necessary, appropriate and adjustments offered in a manner that does not impose a disproportionate burden, where needed in a particular case, to ensure persons with disabilities enjoy or exercise on an equal basis with others all human rights and fundamental freedoms; Sample 1Sample 2.
be ready to get more

Complete this form in 5 minutes or less

Get form

People also ask

6 things every change order should include Project and contact information. The change order form should include: Dates of the change. The change order form should include the date that you complete the change order. Details of the work. Updated schedule. Cost of the change. Updated contract value.
Contractors can add a charge for change orders within the contract to help deter owners from making constant changes. Generally, a construction change order markup of 10% of the net direct cost is considered an acceptable and reasonable charge for change orders.
Average percent change starts at about 4% at the beginning of a project and rises only slightly over the life of the project, finishing at about 4% after the project is complete.