Related links
General Permit for Stormwater Discharges Associated with
Aug 15, 2023 The draft General Permit authorizes the following discharges of stormwater from new or ongoing construction activities located in South Dakota:.
Learn more
final-biowall-protocol-05-08.pdf
BG-05 site at Ellsworth AFB, South Dakota (Parsons, 2006c). Background concentrations of. DO (6.3 to 7.5 mg/L) and sulfate (440 to 590 mg/L), combined with
Learn more
Connecting South Dakota and the Nation
If electronic bid bonds are used, the Contractor is required to submit the bid bond identification number with the Contractors bid. Unless otherwise specified.
Learn more