frame inspection checklist
Framing Inspection Checklist
Check that all roof ventilation has been installed. □. Roof must be complete before framing inspection. □. Get fix for any cut/damaged joist or truss from joist
Learn more
GAO-12-120G, GAO Schedule Assessment Guide
May 30, 2012 In figure 29, rough-in framing inspection now has a 2-day lag on its finish-to-start relationship to the milestone framing complete,.
Learn more
construction-inspection-checklist.docx
This document identifies the office that should be contacted first regarding inspection of the work described in each category. Each contractor inspection