Related links
Guide for Construction Contractors | DOR
All contractors without a physical location in Mississippi are required to prepay the taxes due or bond all contracts over $10,000. Contractors with a physical
Learn more
Architectural Design and Construction
A strategic goal of the Prevention through Design (PtD) Plan for the National Initiative is for designers, engineers, machinery and equipment manufacturers,
Learn more
CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST
New and/or existing electrical meters shall be indicated on the design documents for new and renovation projects. Meters shall be installed by the General
Learn more