Related links
RCW 19.186.020: Written contractRequirementsRight to
A roofing or siding contract shall be in writing. A copy of the contract shall be given to the homeowner at the time the homeowner signs the contract.
Learn more
7 CFR 1924.6 - Performing development work.
All construction work will be performed by one, or a combination, of the following methods: Contract, borrower, mutual self-help, or owner-builder.
Learn more
A305 WARRENPERMIT SET WARREN PERMIT
819 FRONT STREET, STE 2A LEAVENWORTH, WA 98826 509-670-3130 WARREN RESIDENCE LEAVENWORTH, WA PERMIT SET: 01-26-2017 ABBREVIATIONS AB
Learn more