Related links
Pre-engineered and prefabricated buildings ordering guide
Mar 21, 2025 GSA has a whole host of Pre-fabricated and Pre-engineered buildings available for agencies to purchase through our Multiple Award Schedules Program.
Learn more
DSA - Purchasing Department
Jul 2, 2024 CONTRACTOR shall package each submittal appropriately for transmittal and handling. Transmittal format shall be as required by OWNER. CONTRACTOR.
Learn more
Installation and Operations Manual Version 2.1
Do not defeat the safety purpose of the polarized or grounding-type plug. A polarized plug has two blades with one wider than the other.
Learn more