Bore profile template 2025

Get Form
bore profile template Preview on Page 1

Here's how it works

01. Edit your bore profile template online
Type text, add images, blackout confidential details, add comments, highlights and more.
02. Sign it in a few clicks
Draw your signature, type it, upload its image, or use your mobile device as a signature pad.
03. Share your form with others
Send bore profile via email, link, or fax. You can also download it, export it or print it out.

How to use or fill out bore profile template with our platform

Form edit decoration
9.5
Ease of Setup
DocHub User Ratings on G2
9.0
Ease of Use
DocHub User Ratings on G2
  1. Click ‘Get Form’ to open the bore profile template in the editor.
  2. Begin by filling out the Bore Pipe Information section. Enter the Pipe Size (O.D.), Pipe Material & Grade, and Weight of Pipe (lb/ft). Ensure that the pipe material meets the required standards.
  3. Next, specify the Maximum size of the bore hole based on the guidelines provided. Remember, if your O.D. is 12” or less, it should not exceed O.D. x 1.5; for larger sizes, follow the alternative calculation.
  4. In the Equipment Information section, provide details about your Proposed Equipment including Brand/Model and Drilling Fluid Recovery Method. Fill in all relevant drilling parameters such as Minimum and Maximum Drilling RPM and PSI.
  5. Complete the Design Information by entering Entry Angle, Exit Angle, and Depth measurements. Confirm adherence to CSX Transportation’s guidelines by indicating whether you will adopt their Fraction Mitigation Contingency Plan.

Start using our platform today to streamline your document editing and form completion for free!

See more bore profile template versions

We've got more versions of the bore profile template form. Select the right bore profile template version from the list and start editing it straight away!
Versions Form popularity Fillable & printable
2016 4.4 Satisfied (34 Votes)
be ready to get more

Complete this form in 5 minutes or less

Get form

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
Horizontal Directional Bores use Horizontal Directional Drilling (HDD) technology with the notable difference in HDB being no curvature in the bore. To complete a HDB, a drill rig is set up on one side of the crossing and advances lengths of drill rod through the crossing to create a small borehole (pilot shot).
The diameter and the length of the bore also impact the launching pit size. . For example, if a contractor wants to a 20-foot pipe, they must dig a 25-foot-long pitgiving enough room for the equipment and the pipe. The pit depth can vary, but it must be level with the elevation of the pipe installation.
SSDs store data in flash memory, while HDDs store data in magnetic disks. SSDs are a newer technology that uses silicons physical and chemical properties to offer more storage volume, speed, and efficiency.
Horizontal directional drilling is less invasive than micro tunneling because the pits can be shallower, though they still need to be marked for safety. With less disturbance to the ground and surrounding areas, HDD jobs are minimally invasive, making them better for fragile environments and near waterways.
Horizontal Directional Drilling (HDD) is a trenchless method of sewer construction. It is suitable for soft to hard clays, wet soils, and environmentally sensitive areas. This method avoids having to dig large pits to jacking and boring machines.
be ready to get more

Complete this form in 5 minutes or less

Get form

People also ask

Unlike with HDD bores that pull the product back into place, auger boring machines push casing through the borehole as its being dug without the use of drilling fluid. There is minimal overcut between the casing and ground material and no positive pressure being delivered to the ground around the bore hole.
When deep excavation is anticipated, the depth of soil boring should be at least 1.5 times the depth of excavation. Sometimes is required to transfer foundation loads directly to the bedrock.
0:00 6:03 Pre-planning is used in all aspects of the horizontal directional drilling. Process whether it isMorePre-planning is used in all aspects of the horizontal directional drilling. Process whether it is planning the job site layout or the restoration. There should be a plan for it.

bore template profile