Fire sprinkler inspection checklist pdf 2025

Get Form
fire sprinkler inspection checklist pdf Preview on Page 1

Here's how it works

01. Edit your fire sprinkler inspection checklist pdf online
Type text, add images, blackout confidential details, add comments, highlights and more.
02. Sign it in a few clicks
Draw your signature, type it, upload its image, or use your mobile device as a signature pad.
03. Share your form with others
Send fire suppression system inspection checklist pdf via email, link, or fax. You can also download it, export it or print it out.

How to use or fill out fire sprinkler inspection checklist pdf with our platform

Form edit decoration
9.5
Ease of Setup
DocHub User Ratings on G2
9.0
Ease of Use
DocHub User Ratings on G2
  1. Click ‘Get Form’ to open the fire sprinkler inspection checklist PDF in the editor.
  2. Begin by entering the 'Date of Inspection, Testing, Maintenance' and 'System Riser ID' at the top of the form. This information is crucial for record-keeping.
  3. Fill in the 'Property Information' section, including the property name and address. Select the type of system from options like Wet Pipe, Dry Pipe, Preaction, or Deluge.
  4. In the 'Main Drain Test Results' section, input initial static pressure and residual pressure values. These metrics are essential for assessing system performance.
  5. Proceed to complete each activity listed under 'Item', marking inspections (I), tests (T), or maintenance (M) as required. Ensure you reference NFPA 25 guidelines for accuracy.
  6. Finally, document any deficiencies or comments in the designated area and provide your signature along with the date to finalize the inspection report.

Start using our platform today to easily fill out your fire sprinkler inspection checklist PDF for free!

See more fire sprinkler inspection checklist pdf versions

We've got more versions of the fire sprinkler inspection checklist pdf form. Select the right fire sprinkler inspection checklist pdf version from the list and start editing it straight away!
Versions Form popularity Fillable & printable
2008 4.8 Satisfied (49 Votes)
be ready to get more

Complete this form in 5 minutes or less

Get form

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
During a visual inspection, technicians examine the entire system, including sprinkler heads, pipes, valves, and control panels. They look for signs of damage, corrosion, leaks, or any obstructions that may hinder the systems performance.
The three times rule found in NFPA 13 states that sprinklers shall be positioned away from obstructions a minimum distance of three times the maximum dimension of the obstruction. For example, if a ceiling fan hub measures 4 inches by 7 inches, the sprinkler must be positioned at least 21 inches away from the hub.
NFPA 25 is the Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. The purpose of NFPA 25 is to provide requirements that ensure a reasonable degree of protection for life and property from fire through minimum ITM requirements for water-based fire protection systems.
The frequency of testing of fire sprinkler systems in accordance with NFPA 25 is as follows: Quarterly Testing of main drain and mechanical alarm devices. Semi-Annually Test vane and pressure switch type devices. Annually Comprehensive test of fire sprinkler system should be performed.