Related links
Or. Admin. Code 330-210-0045 - Small Premium Project
The department must receive a complete final certification application before the end of the 12 month period or prior to the sunset of the program, whichever
Learn more
Energy Incentives Program 5.8 High Performance
I grant the Oregon Department of Energy (ODOE) permission to inspect the project for compliance with tax credit requirements either before issuing Final.
Learn more
Part IIIBuilding Planning and Construction
SECTION R301. DESIGN CRITERIA. R301.1 Application. Buildings and structures, and all parts thereof, shall be constructed to safely support all loads,
Learn more