New mexico building application 2025

Get Form
cid nm Preview on Page 1

Here's how it works

01. Edit your cid nm online
Type text, add images, blackout confidential details, add comments, highlights and more.
02. Sign it in a few clicks
Draw your signature, type it, upload its image, or use your mobile device as a signature pad.
03. Share your form with others
Send multi purpose state building application nm via email, link, or fax. You can also download it, export it or print it out.

How to use or fill out New Mexico Building Application with DocHub

Form edit decoration
9.5
Ease of Setup
DocHub User Ratings on G2
9.0
Ease of Use
DocHub User Ratings on G2
  1. Click ‘Get Form’ to open the New Mexico Building Application in our editor.
  2. Begin by selecting the appropriate type of application you are submitting, such as 'Building Review/Permit' or 'Trade Review Only'.
  3. Fill in the required project details, including Parcel No., Project Address, and nearest City/Town. Ensure you provide GPS coordinates if available.
  4. Complete the Property Owner or Homeowner Information section with your first name, last name, and contact details.
  5. Provide Contractor Information, including company name and NM State License number. Attach proof of contract if necessary.
  6. In the Design Professional Information section, enter relevant details about your design professional, including their contact information.
  7. Specify construction type and energy compliance details as required in the form.
  8. Finally, read and sign the applicant acknowledgment section to confirm that all information is correct before submitting your application.

Start filling out your New Mexico Building Application online for free using our platform today!

See more new mexico building application versions

We've got more versions of the new mexico building application form. Select the right new mexico building application version from the list and start editing it straight away!
Versions Form popularity Fillable & printable
2015 4.8 Satisfied (278 Votes)
2009 4 Satisfied (43 Votes)
be ready to get more

Complete this form in 5 minutes or less

Get form

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
Do I need a permit? Less than 10 square metres (108 square feet) Not attached to a house or any other building. Not connected to electricity, plumbing, or gas lines. Meets the following height and location criteria: Roof midpoint is no higher than 4.3 metres (14.1 feet)
How do I get a building permit? Building permits require Zoning Approval by the Planning and Land Use Department. Once the zoning approval is granted, you will need to contact to NM Construction Industries Division to obtain a Building Permit.
Q: How long does it take to get a permit? Permits are processed by the date they are received. Residential permits are being processed in 3 to 4 working days. Commercial permits are processed in 5 to 10 working days.
For summer houses, sheds and detached garages, no building regulations approval is required if: The building is under 15 square metres and has no sleeping accommodation. The building is between 15 and 30 square metres, has no sleeping accommodation, and: Is at least 1 metre from any boundary, or.
The quick and simple answer is: you usually dont need a permit if the shed is 120 square feet or less. In California, most jurisdictions have adopted the 120 square foot rule. If your shed area is larger than 120 square feet, it needs a building permit.

People also ask

The new fee amounts are applied for all new permit applications beginning January 1, 2025. Please make sure to submit the correct fee amount with General Construction Permit applications ($5,230), Streamline applications ($5,230), and Relocation applications ($523).

state of new mexico multi purpose state building application