Get the up-to-date rigging plan template 2024 now

Get Form
rigging plan template Preview on Page 1

Here's how it works

01. Edit your form online
01. Edit your form online
Type text, add images, blackout confidential details, add comments, highlights and more.
02. Sign it in a few clicks
02. Sign it in a few clicks
Draw your signature, type it, upload its image, or use your mobile device as a signature pad.
03. Share your form with others
03. Share your form with others
Send it via email, link, or fax. You can also download it, export it or print it out.

How to quickly redact Rigging plan template online

Form edit decoration
9.5
Ease of Setup
DocHub User Ratings on G2
9.0
Ease of Use
DocHub User Ratings on G2

Dochub is the greatest editor for updating your documents online. Follow this straightforward guideline edit Rigging plan template in PDF format online at no cost:

  1. Register and sign in. Register for a free account, set a strong password, and proceed with email verification to start working on your templates.
  2. Add a document. Click on New Document and choose the form importing option: upload Rigging plan template from your device, the cloud, or a secure link.
  3. Make changes to the sample. Utilize the upper and left-side panel tools to modify Rigging plan template. Add and customize text, images, and fillable areas, whiteout unneeded details, highlight the significant ones, and comment on your updates.
  4. Get your documentation completed. Send the sample to other people via email, generate a link for faster document sharing, export the sample to the cloud, or save it on your device in the current version or with Audit Trail included.

Try all the benefits of our editor right now!

be ready to get more

Complete this form in 5 minutes or less

Get form

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
A rigging plan is developed every time a heavy load is being lifted. The basic idea behind a rigging plan is to have control and establish safety precautions. It is an important planning process that will identify all hazardous situations that might be encountered during lifting.
In order to ensure proper rigging techniques and a safe lift, take the following steps when creating your rigging plan: Consider the Load. Consider the Lift Environment. Consider the Personnel. Consider the Machine. Conduct a Pre-Use Inspection.
The lift plan must include: The type, size, model, lifting capacity, certification date and serial number of the crane to be used. A list of items to be lifted/moved, including a description of each items weight, dimensions, center of gravity, and presence of hazardous toxic materials.
The rule of thumb is the capacity of the sling should be reduced by one-quarter less than the safe working load for a single vertical hitch rating. considered in this formula. Used when loads have an opening for the sling to be passed through and the load is well balanced or not likely to slip.
Lifting and rigging specialists tend to prefer 60 angles. When a multi-leg sling is tagged, it is tagged for 60. Slings also can be used at 45 or 30, but for most of the lifts, 60 is the baseline sling angle that riggers want to use.
be ready to get more

Complete this form in 5 minutes or less

Get form

People also ask

Rigging refers to the use of mechanical load-shifting equipment and associated gear to move, place or secure a load. Lifting loads with rigging predominantly involves working and/or load traversing at height. Risks of workers falling, or suspended loads falling must be considered.
Rigging is securing the load to enable handling and placement, while opposing gravity to move from one position to another is lifting. With advancement in industrialization, construction industry is expanding.
you just take the 10-inch roof. and if the rigging is hanging at an angle to the load. you would take an a ten inch ruler. and slide it down the load until it touches.
Determine the center of gravity of the load. Protect sling from sharp surfaces. Protect load from rigging, if necessary. Allow for increased tension caused by sling angles.
When rigging, make sure the load hook and upper suspension form a straight line. The chain or body of the hoist should never come in contact with the load. Never tip-load hooks. Always use a sling or lifting device to rig around loads and use engineered lift points for attachment.