Related links
Quarterly Construction Status Report - Period Ending
Jul 31, 2024 This quarterly report is only for UPDC projects over $500,000. Other departments, such as Facility Operations, ITS,.
Learn more
Classifications - Contractor Prequalification
The contract must include a variety of construction practices and supervision of a minimum of three sub-trades. Includes those designs that are repetitive,
Learn more
Timber Pile Design and Construction Manual
by TP Council Cited by 12 3.0 Timber Pile Properties. 3.1 Introduction. 3.2 Allowable Stress Design. 3.3 Tabulation of Allowable Stress and Pile Capacity. 3.3.1 Pipe Capacity.
Learn more