Department of building and housing 2026

Get Form
eric ulrich department of buildings Preview on Page 1

Here's how it works

01. Edit your eric ulrich department of buildings online
Type text, add images, blackout confidential details, add comments, highlights and more.
02. Sign it in a few clicks
Draw your signature, type it, upload its image, or use your mobile device as a signature pad.
03. Share your form with others
Send leena panchwagh via email, link, or fax. You can also download it, export it or print it out.

How to use or fill out the Department of Building and Housing Permit Application

Form edit decoration
9.5
Ease of Setup
DocHub User Ratings on G2
9.0
Ease of Use
DocHub User Ratings on G2
  1. Click ‘Get Form’ to open it in the editor.
  2. Begin by entering the name of the license holder and company name in the designated field, followed by your complete mailing address.
  3. Provide the boiler contractor's phone number, including both office and cell numbers, ensuring all contact information is accurate.
  4. Input your boiler contractor license number along with its expiration date to validate your credentials.
  5. Specify where the installation will take place by providing the name of the business and its mailing address, including the county.
  6. Fill in the name, address, and telephone number of the business owner for official records.
  7. Indicate what type of installation this permit is for by selecting from options such as HP Steam or LP Steam, and provide approximate start dates and sizes as required.
  8. Select the appropriate pipe material from options like steel or plastic, then choose a fee range that corresponds to your project cost.
  9. Complete any additional fields regarding pipe joints and confirm approval status before submitting your application.

Start using our platform today to streamline your permit application process for free!

be ready to get more

Complete this form in 5 minutes or less

Get form

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
Pinellas County requires a permit for any new building, addition, remodeling, or demolition, or work in excess of $500.00 or which would require an inspection.
Jackie Kovilaritch, Legal Department City Attorney.
A zoning clearance, habitat/tree/environmental permit, and right-of-way permit are required for a new, replacement, or an extension of a driveway.
If you encounter any issues or errors, please email us at eplanreview@stpete.org with a brief description of the issue and a screenshot, and we will investigate. Apply, renew, and manage permits. All permitting needs for small to large projects. Pay permitting fees and learn about impact fees.
What is the 49% Rule? This prohibits improvements/repairs for damage to a structure in the SFHA exceeding 49% of its market value unless the entire structure is brought into full compliance with current zoning, building, and floodplain management regulations.

Security and compliance

At DocHub, your data security is our priority. We follow HIPAA, SOC2, GDPR, and other standards, so you can work on your documents with confidence.

Learn more
ccpa2
pci-dss
gdpr-compliance
hipaa
soc-compliance

People also ask

Problem with a road, sidewalk, street sign, stormwater catch basin, street sweeping or related? Reach the Stormwater, Pavement, and Traffic Operations Department by calling 727-893-7421 Monday - Friday, 7:30 a.m. - 3:30 p.m. Alternatively, you can submit a ticket in SeeClickFix above.
Unsafe structures should be reported to the department immediately by calling 727-893-7373.