James hardie installation guide pdf 2025

Get Form
james hardie siding installation pdf Preview on Page 1

Here's how it works

01. Edit your james hardie siding installation pdf online
Type text, add images, blackout confidential details, add comments, highlights and more.
02. Sign it in a few clicks
Draw your signature, type it, upload its image, or use your mobile device as a signature pad.
03. Share your form with others
Send hardie board and batten installation pdf via email, link, or fax. You can also download it, export it or print it out.

How to quickly redact James hardie installation guide pdf online

Form edit decoration
9.5
Ease of Setup
DocHub User Ratings on G2
9.0
Ease of Use
DocHub User Ratings on G2

Dochub is a perfect editor for changing your forms online. Follow this straightforward guideline edit James hardie installation guide pdf in PDF format online free of charge:

  1. Register and sign in. Create a free account, set a strong password, and proceed with email verification to start working on your templates.
  2. Add a document. Click on New Document and select the form importing option: upload James hardie installation guide pdf from your device, the cloud, or a protected URL.
  3. Make changes to the sample. Utilize the upper and left-side panel tools to modify James hardie installation guide pdf. Insert and customize text, pictures, and fillable fields, whiteout unnecessary details, highlight the important ones, and comment on your updates.
  4. Get your paperwork completed. Send the sample to other individuals via email, create a link for faster file sharing, export the sample to the cloud, or save it on your device in the current version or with Audit Trail added.

Discover all the advantages of our editor right now!

be ready to get more

Complete this form in 5 minutes or less

Get form

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
The recommended distance for an air gap is determined by plumbing code requirements, ensuring enough vertical space between the potable water supply and the potential entry point of dirty water. Typically, however, an air gap should provide an unobstructed space at least twice the diameter of the water outlet pipe.
Note: Cladding with HardiePlank cladding must always be carried out as a ventilated faade with min 20 mm distance between the cladding and the rear lining (insulation material). However, in special situations (e.g. high rise buildings) local regulations may demand a larger ventilation gap.
James Hardie Fiber Cement Siding Design The Exposure or Reveal means how much of the lap siding is visible. The standard new construction siding and most economic option is a 7 reveal exposure (8 1/4 James Hardie Plank board with a 1 overlap per James Hardie Elite Contractor Preferred Guidelines).
An air gap between the water supply inlet and the flood level rim of the plumbing fixture, equipment, or nonfood equipment shall be at least twice the diameter of the water supply inlet and may not be less than 25 millimeters (1 inch).
The minimum airgap required for any installation is contained in the first row of the table. For effective openings not greater than one-half inch, a minimum airgap of one inch is required. Therefore, all airgaps must be at least one inch in vertical distance above the flood level rim.
be ready to get more

Complete this form in 5 minutes or less

Get form

People also ask

Optionally, the lap siding with a maximum 1/8 gap and caulk the joint ** (see detail at right). The first course of any wall should be installed over a 1/4 lath strip to ensure a consistent plank angle (see figure 1).
You should have a minimum of ⅝ thick exterior grade plywood or 23/32 thick OSB with minimum exposure 1 classification.
Youll need 2 x 4 wood studs or 20-gauge metal studs. They must be straight, properly aligned, and spaced a maximum of 16 on center. If youre planning to use your Hardie Backer cement board on tub and shower enclosures, first ensure that the framing is adequately reinforced at the corners.

james hardie installation guide