Get the up-to-date as9102 form 2024 now

Get Form
as9102 Preview on Page 1

Here's how it works

01. Edit your as9102 rev c forms download online
01. Edit your as9102 rev c pdf free download online
Type text, add images, blackout confidential details, add comments, highlights and more.
02. Sign it in a few clicks
02. Sign it in a few clicks
Draw your signature, type it, upload its image, or use your mobile device as a signature pad.
03. Share your form with others
03. Share your form with others
Send as9102 form via email, link, or fax. You can also download it, export it or print it out.

The easiest way to edit As9102 form in PDF format online

Form edit decoration
9.5
Ease of Setup
DocHub User Ratings on G2
9.0
Ease of Use
DocHub User Ratings on G2

Handling documents with our extensive and intuitive PDF editor is easy. Adhere to the instructions below to complete As9102 form online easily and quickly:

  1. Log in to your account. Sign up with your credentials or create a free account to try the service prior to choosing the subscription.
  2. Upload a form. Drag and drop the file from your device or add it from other services, like Google Drive, OneDrive, Dropbox, or an external link.
  3. Edit As9102 form. Effortlessly add and highlight text, insert pictures, checkmarks, and icons, drop new fillable areas, and rearrange or remove pages from your document.
  4. Get the As9102 form completed. Download your modified document, export it to the cloud, print it from the editor, or share it with other participants through a Shareable link or as an email attachment.

Take advantage of DocHub, the most straightforward editor to quickly handle your documentation online!

be ready to get more

Complete this form in 5 minutes or less

Get form

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
The first article inspection process serves two important purposes. The first is to inspect and validate all documented requirements. The second is establishing the manufacturing Plan of Record or POR for the production line. Once the manufacturer establishes the POR, they must replicate it on an ongoing basis.
PPAP (Production Part Approval Process) is a mandatory process in the automotive industry, and is designed to assess the manufacturability of the supplier to fulfill customer quality requirements. FAI (First Article Inspection) is the aerospace equivalent of the PPAP and is also called initial quality control.
The AS9102 standard defines first article inspection as, \u201cA planned, complete, independent, and documented inspection and verification process to ensure that prescribed production processes have produced an item conforming to engineering drawings, DPD, planning, purchase order, engineering specifications, and/or other ...
First Article Inspection (FAI) consists of a detailed verification and comparison of a requirement (product design) versus results (production result). A supplier needs to do a First Article Inspection due to its industry requirements like AS9102 or customer requirements before the manufacturing process begins.
A First Article Inspection (FAI) is a design verification process for verifying that a new or modified production process produces conforming parts that meet the manufacturing specification detailed in technical or engineering drawings. Typically, a supplier performs the FAI and the purchaser reviews the report.

People also ask

First Article Inspection (FAI) is the process of planning, manufacturing, and verifying a production process. A First Article Inspection Report (FAIR) is the document that certifies that each sample was produced and inspected according to the customer's specifications.
A First Article Inspection (FAI) assesses the quality of one to five items that are selected from the first mass production run for testing. The items are chosen at random and act as a sample for the rest of the production run.
An FAI report utilizes the dimensional properties of a production part in comparison to design specifications. Items to be checked by the FAI are wide and varied and may include distances between edges, positions of holes, diameters and shapes of holes, weight, density, stiffness, color or surface finish.
Boeing First Article Inspection (BFAI) is a Boeing supplier surveillance process which provides for the verification of a supplier's FAI, including physical verification of individual characteristics as deemed necessary by Boeing, to ensure all engineering, design and specification requirements have been fulfilled.
The purpose of an FAI is to provide objective evidence that all engineering, design and specification requirements are correctly understood, accounted for, verified and recorded.

as9102 pdf free download