Getting full control over your files at any time is vital to ease your day-to-day tasks and improve your productivity. Accomplish any goal with DocHub features for papers management and hassle-free PDF file editing. Access, change and save and integrate your workflows along with other secure cloud storage.
DocHub gives you lossless editing, the chance to use any formatting, and safely eSign papers without the need of searching for a third-party eSignature software. Maximum benefit from the file managing solutions in one place. Check out all DocHub features today with your free profile.
Hello. Im Jennifer Whitt, Director of ProjectManager.com. [Music Intro] Well, welcome to our whiteboard session today on, What is Project Change Control? Well, we look at one particular item, specifically the triple constraint. So, you can reference the triple constraint. You can Google this term, or you can look at what the Project Management Institute says about it, PMI. Those are some references. But the triple constraint of a project has to do with looking at the scope or the deliverable were going to be producing, the cost or the budget for the project, the time or the schedule, and the quality. This is outlined in the baseline project plan. So when we talk about change control throughout the project, not just the beginning or the end, but throughout the whole entire project, changes can occur, as we all know. Some things we havent thought about, maybe risks occur, issues happen, maybe theres a federal regulation we have to comply with or a natural disaster. There are num