Whether you deal with papers every day or only occasionally need them, DocHub is here to help you take full advantage of your document-based projects. This tool can embed construction in Camper Parental Authorization, facilitate user collaboration and create fillable forms and legally-binding eSignatures. And even better, everything is kept safe with the top security requirements.
With DocHub, you can access these features from any location and using any platform.
Embedded Items. Be sure to use templates for setting bolts and inspect for accurate location prior to placement of concrete. Anchor embedded items securely. Maintain spacing and clearances of all the embedded items. ACI 318-14 repealed conduit and piping embedment requirements of ACI 318-11 Section 6.3.4. The requirements are now in Section 26.8 of ACI 318-14. The PI needs to make sure there is no conduit or piping congestion in the slab or wall. We need to be proactive and resolve the homeruns into electrical rooms or cabinets before we pour. Pour and chip later is not a way to construct concrete structures. Theres a project currently under construction where the head of the vibrator was lost inside the column. Instead of opening the form to retreive the vibrator, the contractor proceeded to cast a vibrator in the column. Fortunately for the district, the structural engineer has directed the general contractor to remove the vibrator. Anchor Bolts: cut thread versus rolled thread. The