Create your Cost Plus Construction Contract from scratch

Start Building Now
Title decoration

Here's how it works

01. Start with a blank Cost Plus Construction Contract
Open the blank document in the editor, set the document view, and add extra pages if applicable.
02. Add and configure fillable fields
Use the top toolbar to insert fields like text and signature boxes, radio buttons, checkboxes, and more. Assign users to fields.
03. Distribute your form
Share your Cost Plus Construction Contract in seconds via email or a link. You can also download it, export it, or print it out.

A detailed guide on how to design your Cost Plus Construction Contract online

Form edit decoration

Step 1: Start with DocHub's free trial.

Visit the DocHub website and sign up for the free trial. This gives you access to every feature you’ll require to create your Cost Plus Construction Contract without any upfront cost.

Step 2: Navigate to your dashboard.

Sign in to your DocHub account and proceed to the dashboard.

Step 3: Craft a new document.

Click New Document in your dashboard, and select Create Blank Document to craft your Cost Plus Construction Contract from the ground up.

Step 4: Use editing tools.

Insert various fields such as text boxes, radio buttons, icons, signatures, etc. Arrange these elements to match the layout of your document and designate them to recipients if needed.

Step 5: Modify the form layout.

Rearrange your document in seconds by adding, moving, deleting, or combining pages with just a few clicks.

Step 6: Craft the Cost Plus Construction Contract template.

Transform your freshly designed form into a template if you need to send multiple copies of the same document numerous times.

Step 7: Save, export, or share the form.

Send the form via email, share a public link, or even publish it online if you aim to collect responses from more recipients.

be ready to get more

Build your Cost Plus Construction Contract in minutes

Start creating now

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
Cons of cost plus a percentage of cost in a contract This type of contract doesnt address the final cost, which can shift the risk onto the client. It may be harder to adhere to a budget because the final cost is unknown when they sign the contract.
A cost-plus contract is a construction agreement that requires reimbursement for project costs as well as a markup that covers the contractors overhead and profit. In other words, the name is a short-hand way of remembering what the contract covers: project costs plus contractor markup.
Time-and-materials involves the vendor billing the client for the cost of materials, as well as an hourly rate for the different types of labor involved on the project. CPFF is when the client pays the cost of the materials and time, plus a flat-fee on top of those costs.
If you use a cost plus contract, you must give a fair and reasonable estimate of the total amount of money you are likely to receive under the contract at the time the contract is signed. You should be careful that the estimate is not a representation of the final contract price.
One drawback of cost-plus pricing is potential profit loss. If you switch suppliers or get cheaper materials, your costs will get lower. Strictly cost-plus pricing would require you to lower your selling price. If consumers are willing to pay more for the product, youd be missing out on revenue.
be ready to get more

Build your Cost Plus Construction Contract in minutes

Start creating now

Related Q&A to Cost Plus Construction Contract

Disadvantages of these agreements With a cost-plus commitment, contractors typically fund the purchase of materials, equipment and tools and receive reimbursement when the project is complete. The time between buying these items and receiving payment may challenge contractors who dont have the funds upfront.
Here are six practice tips that can help an owner protect themselves from the risk posed by a Cost-Plus contract: 1) Demand Quantity Guarantees. 2) Limit Increases in the Contractors Fee. 3) Eliminate Budgetary Fluff. 4) Carefully Select the Project Team. 5) Demand Transparency. 6) Reduced Risk means a Reduced Fee.
Cost-plus contracts can lead to surging project costs beyond initial budgets since there are no constraints around a fixed price cap. Owners take on heavy financial risk and must closely scrutinise all contractor pay applications.

Additional resources on building your forms