Create your Building Package from scratch

Start Building Now
Title decoration

Here's how it works

01. Start with a blank Building Package
Open the blank document in the editor, set the document view, and add extra pages if applicable.
02. Add and configure fillable fields
Use the top toolbar to insert fields like text and signature boxes, radio buttons, checkboxes, and more. Assign users to fields.
03. Distribute your form
Share your Building Package in seconds via email or a link. You can also download it, export it, or print it out.

Build Building Package from the ground up by following these detailed guidelines

Form edit decoration

Step 1: Start off by launching DocHub.

Begin by signing up for a free DocHub account using any offered sign-up method. If you already have one, simply log in.

Step 2: Register for a free 30-day trial.

Try out the entire collection of DocHub's advanced features by signing up for a free 30-day trial of the Pro plan and proceed to build your Building Package.

Step 3: Start with a new blank document.

In your dashboard, hit the New Document button > scroll down and choose to Create Blank Document. You’ll be redirected to the editor.

Step 4: Organize the document’s layout.

Utilize the Page Controls icon marked by the arrow to toggle between two page views and layouts for more flexibility.

Step 5: Start inserting fields to create the dynamic Building Package.

Explore the top toolbar to add document fields. Insert and format text boxes, the signature block (if applicable), add photos, and other elements.

Step 6: Prepare and configure the incorporated fields.

Arrange the fillable areas you incorporated based on your desired layout. Modify the size, font, and alignment to make sure the form is straightforward and professional.

Step 7: Finalize and share your document.

Save the ready-to-go copy in DocHub or in platforms like Google Drive or Dropbox, or create a new Building Package. Share your form via email or get a public link to reach more people.

be ready to get more

Build your Building Package in minutes

Start creating now

Got questions?

We have answers to the most popular questions from our customers. If you can't find an answer to your question, please contact us.
Contact us
The Building Design Process Step One: Preliminary Research. Step Two: Select Your Designer. Step Three: Do a Comprehensive Site Analysis. Step Four: The Concept Proposal and Design Contract. Step Five: Development of the Building Concept. Step Six: Building Design Development. Step Seven: Create the Final Design.
The length of the permit process depends on the type of application, project, and situation. Generally, the Countys building plan check process takes two to four weeks. Many projects also have to go through local planning application or process as well.
California Permit fees consider structure use, cost, square footage, and construction type. Permits to build a house range from $1,200 to $3,000 on average, depending on the city. Other fees include submission, inspection, sewer, zone check, water, park, architectural services, and transportation development impact.
A Building Permit application must be made to the local authorities office and at this time, the Plan Check and Permit Fees will be calculated before any Permits are issued. All Building Permit applications must be accompanied by the building plans, with an initial plan review usually completed within two weeks.
A Step-by-Step Guide to the Home Building Process Prepare Construction Site and Pour Foundation. Complete Rough Framing. Complete Rough Plumbing, Electrical and HVAC. Insulation. Complete Drywall and Interior Fixtures; Start Exterior Finishes. Finish Interior Trim; Exterior Walkways and Driveway.
be ready to get more

Build your Building Package in minutes

Start creating now

Related Q&A to Building Package

ing to the California Building Standards Code, no building or structure may be erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a separate permit for each building or structure has first been obtained from the building official.
The person or persons performing the work must obtain the permit. It is a violation of state law if a contractor commences work without first obtaining a permit under their state contractors license.
5 Most Important Steps of Home Construction #1. Site prep and foundation. First we lay the foundation a wood framework with poured concrete. #2. Framing. #3. Exterior and Infrastructure. #4. Interior Build-Out. #5. Finishing Touches.

Additional resources on building your forms